Ohio Valley Manor, Phase 1

  • New Construction – Assisted Living facility expansion (Scheduled Completion, 2012)
  • 17,000 SF expansion attached to an existing Long Term Care facility
  • First phase of a multiple phased expansion. Phase one includes the construction of a scenic lake with overlook for residents and staff
  • Design Build delivery method was used for this project
  • Mechanical design engineering provided by Herndon Engineers

 

Pauline Warfield Lewis Center – Psyciatric Hospital

  • New Construction of 100,000 SF Residential Healthcare Facility with management offices, classrooms, library, and a chapel
  • Design-Bid-Build delivery method was utilized for this project
  • Architect of record is SFA Architects

Veteran Affairs

  • New Construction of 17,163 SF Community Based Outpatient Clinic
  • Originally designed to be a retail center, the building shell was adapted to accommodate medical office space
  • The medical area includes: 20 exam rooms, laboratories, an audiology room, and administrative offices for physicians and Veteran Affairs staff
  • Design Build delivery method was used for this project

Vernon Place Medical Building

  • 40,000 SF 3 story New Construction Medical Office Building
  • Design Build delivery method was used for this project
  • Architect of record is A.M. Kinney and Associates

“Even two years after our initial occupancy, we are getting compliments on the design and the continued new appearance.  Rest assured that if we need to construct a new satellite facility, we will certainly avail ourselves of your services.”
– Dr. Michael Safdi

CareFor Place

  • New Construction four story 38,480 SF Assisted Living facility
  • Scope of services included: preliminary design and needs assessment, budgeting, value engineering and Turn-key construction
  • Design Build delivery system was used for this project
  • Architect of record is PDT & Co. Architects/Planners

Kreindler Medical Center and Parking Garage

  • New Construction of Medical Office Building
  • 52,000 SF of doctors Office and Outpatient Care Facility with a 220 car parking garage
  • Design Build delivery method was used for this project
  • Architect of record is The L.O.M. Corporation